Project Cases
Covering prefab buildings, healthcare/public projects, industrial plants, underground corridors and renovation. (State-owned enterprise project details are disclosed under authorization; volumes per final settlement.)

South China Prefab Housing Industrial Park
The housing component of the industrial park used prefab construction with magnesium prefab wall panels throughout. Dry installation ran in parallel with structural work; no plastering or painting was needed, markedly shortening fit-out. The Class A1 panel base passed fire acceptance.

East China Grade-A Hospital Extension Smoke Ducts
Smoke-exhaust ducts in the hospital extension were encased with magnesium fire-rated duct boards. Fire-resistant assemblies were selected per the general fire code, with detail drawings and on-site briefing to preserve smoke-system integrity in this densely occupied facility.

Guangxi Manufacturing Base Fire Partitions
Fire separation between the workshop and warehouse used magnesium fire base boards for partitions and ceiling bases — moisture-proof and durable in humid, dusty conditions. Office areas used prefab decorative panels for fast completion.

Southwest Chain Hotel Fast Fit-out
Guestroom-floor renovation used magnesium prefab decorative panels with wood-grain finish — no painting, dry assembly — plus custom door frames. Phased works proceeded without disrupting lower-floor operations, delivering on schedule for opening.

Urban Utility Corridor Smoke Duct Encasement
Fire ventilation ducts of an urban utility corridor were encased with magnesium fire-rated duct boards. The boards remain stable and durable in the humid underground environment, with Class A1 assemblies meeting corridor fire-design requirements.

Guangxi Middle School Teaching Building Holiday Renovation
Partition and ceiling renovation during summer break used magnesium fire base boards and prefab panels — formaldehyde-free and quickly dry-installed — completing works and handing over fire documentation before term began.